In the east of London, one of the largest city extensions of the city is being built. To ensure access to public transport, a new station, called Barking Riverside, is being built.
In the east of London, the Barking Riverside station is to be built to connect to the city extension area of ββthe same name, which includes 10,800 new apartments. A bridge will be built to get over the Tilbury Loop. The track system to be built is Slab Track Austria (STA). A transition to ballasted track is required.
Schembera Consulting ZT supports Rhomberg Sersa UK in the interpretation of the Track-Bridge Interaction with regard to the requirements for track design as the basis for track design. In addition, we act as check engineer of the slab track design in the system Slab Track Austria (STA) system, the crossover and the transition areas to the ballasted track.